Dominion Atlantic Railway Digital Preservation Initiative - Wiki

Use of this site is subject to our Terms & Conditions.

Difference between revisions of "Habitant River Bridge"

From DARwiki
(details)
Line 8: Line 8:
 
* Trestle bents had five pilings, 10" on the inside, 14" on the outside
 
* Trestle bents had five pilings, 10" on the inside, 14" on the outside
 
* Appear to have been six trestle bents: three each side of the river with a short span
 
* Appear to have been six trestle bents: three each side of the river with a short span
* Old boiler pipe post on west side of north end of bridge, probably post for sign
+
* Old 2 1/2" boiler pipe post on west side of north end of bridge, probably post for sign
  
 
==Gallery==
 
==Gallery==
Line 20: Line 20:
  
 
==References and Footnotes==
 
==References and Footnotes==
 
+
Dan Conlin Field notes CVR Trip, April 20, 2008
  
 
==External Links==
 
==External Links==
 
[[Category:Bridges]]
 
[[Category:Bridges]]
 
[[Category:Subdivision Kingsport|09.20]]
 
[[Category:Subdivision Kingsport|09.20]]

Revision as of 15:35, 8 November 2013

Habitant River Bridge


Pile trestle bridge over Habitant river, c. Mile 9.2

  • Trestle bents had five pilings, 10" on the inside, 14" on the outside
  • Appear to have been six trestle bents: three each side of the river with a short span
  • Old 2 1/2" boiler pipe post on west side of north end of bridge, probably post for sign

Gallery

References and Footnotes

Dan Conlin Field notes CVR Trip, April 20, 2008

External Links