Started in 1910, the Weston Subdivision was completed in 1914. A [[The_Railway_and_Marine_World_-_1908_-_02_-_Re_Weston_Sub|railway trade magazine article]] in 1908 mentioned the then-proposed [[:Category:Subdivision Weston|Weston Subdivision]]. It was often referred to as the North Mountain Railway, the North Mountain Line or the Weston Line but was officially incorporated as the [[1902_Nova_Scotia_Chapter_130_-_An_Act_to_incorporate_the_North_Mountain_Railway_Company,_Limited|North Mountain Line Railway Company Limited in 1902.]]<ref>[http://ns1758.ca/rail/railway15.html Ivan Smith, "North Mountain Railway Company Limited", ''History of Railway Companies in Nova Scotia'' website]</ref> The first shareholders were C. Fitch Kemp, Thomas Robert Ronald, Archibald Denny and Robert Lee Campbell, of London, England, and Percy Gifkins, of Kentville, Nova Scotia. All the London residents were on the board of directors of the DAR, (Kemp - President, Ronald - Vice President, Campbell - Secretary, Denny - director) and Percy Gifkins was the General Manager of the DAR. It received a charter to build a railway in 1904 and renewed it in 1906.<ref>[[Marguerite Woodworth]], ''[[History of the Dominion Atlantic Railway]], page 136.</ref> (According to Marguerite Woodworth's [[History of the Dominion Atlantic Railway|book]], page 136, but the legislation allowed construction starting in 1902.) However the owners lacked the money to start construction.
 
Started in 1910, the Weston Subdivision was completed in 1914. A [[The_Railway_and_Marine_World_-_1908_-_02_-_Re_Weston_Sub|railway trade magazine article]] in 1908 mentioned the then-proposed [[:Category:Subdivision Weston|Weston Subdivision]]. It was often referred to as the North Mountain Railway, the North Mountain Line or the Weston Line but was officially incorporated as the [[1902_Nova_Scotia_Chapter_130_-_An_Act_to_incorporate_the_North_Mountain_Railway_Company,_Limited|North Mountain Line Railway Company Limited in 1902.]]<ref>[http://ns1758.ca/rail/railway15.html Ivan Smith, "North Mountain Railway Company Limited", ''History of Railway Companies in Nova Scotia'' website]</ref> The first shareholders were C. Fitch Kemp, Thomas Robert Ronald, Archibald Denny and Robert Lee Campbell, of London, England, and Percy Gifkins, of Kentville, Nova Scotia. All the London residents were on the board of directors of the DAR, (Kemp - President, Ronald - Vice President, Campbell - Secretary, Denny - director) and Percy Gifkins was the General Manager of the DAR. It received a charter to build a railway in 1904 and renewed it in 1906.<ref>[[Marguerite Woodworth]], ''[[History of the Dominion Atlantic Railway]], page 136.</ref> (According to Marguerite Woodworth's [[History of the Dominion Atlantic Railway|book]], page 136, but the legislation allowed construction starting in 1902.) However the owners lacked the money to start construction.
  
Land acquisition and right of way permissions were sought in 1910 and the Dominion Atlantic Railway announced construction was beginning in April 1910 with an expected completion in 1913.<ref>[http://ns1758.ca/rail/railway15.html Ivan Smith, "North Mountain Railway Company Limited", ''History of Railway Companies in Nova Scotia'' website]</ref><ref>[[The_Railway_and_Marine_World_-_1910-04_-_North_Mountain_Branch_Construction_To_Begin_Soon|''The Railway and Marine World'' April 1910, "North Mountain Branch Construction To Begin Soon"]]</ref> In reality, it took the resources of the Canadian Pacific Railway to complete the line after the CPR bought the DAR in 1912. The roadbed was built by Kirk and Cooke, contractors while the stations were built by [[J. H. Hicks & Sons]] of [[Bridgetown]].<ref>''[[The Weston Branch and Margaretville in Nova Scotia]]'' by Elizabeth M. Clarke, page 13 and addendum insert</ref> <ref>Letter Alex Ferguson Inspection Engineer, Dept of Railways and Canals, Jan. 14, 1916, Library and Archives Canada RG43-A-1-12, Vol. 227, File 3125</ref> Contractors hired local horse teams as well as Italian labourers. Work included many large concrete culverts and a long pipeline from a spring on the North Mountain to the wye at [[Weston]] to supply a locomotive water tank. A cookhouse and quarters for the workers were built at Chute Road near Weston.<ref>Mrs. John Horsnell, typescript history "North Mountain Line", Weston binder, [[Kings County Museum|Kings Historical Society]], Kentville</ref>
+
Land acquisition and right of way permissions were sought in 1910 and the Dominion Atlantic Railway announced construction was beginning in April 1910 with an expected completion in 1913.<ref>[http://ns1758.ca/rail/railway15.html Ivan Smith, "North Mountain Railway Company Limited", ''History of Railway Companies in Nova Scotia'' website]</ref><ref>[[The_Railway_and_Marine_World_-_1910-04_-_North_Mountain_Branch_Construction_To_Begin_Soon|''The Railway and Marine World'' April 1910, "North Mountain Branch Construction To Begin Soon"]]</ref> In reality, it took the resources of the Canadian Pacific Railway to complete the line after the CPR bought the DAR in 1912. The roadbed was built by Kirk and Cooke, contractors while the stations were built by [[J. H. Hicks & Sons]] of [[Bridgetown]].<ref>''[[The Weston Branch and Margaretville in Nova Scotia]]'' by Elizabeth M. Clarke, page 13 and addendum insert</ref> <ref>Letter Alex Ferguson Inspection Engineer, Dept of Railways and Canals, Jan. 14, 1916, Library and Archives Canada RG43-A-1-12, Vol. 227, File 3125</ref> Contractors hired local horse teams as well as Italian labourers. By August 1913, tracks had been laid and construction trains were running as far as [[Lakeville]], while large crews were working on the roadbed as far as Weston.<ref>[[The Weekly Monitor and Western Annapolis Sentinel - August 13 1913 - DAR's North Mountain Railway - Track Laid To Lakeville|''The Weekly Monitor and Western Annapolis Sentinel'', August 13 1913 - "DAR's North Mountain Railway - Track Laid To Lakeville"]]</ref> Work included many large concrete culverts and a long pipeline from a spring on the North Mountain to the wye at [[Weston]] to supply a locomotive water tank. A cookhouse and quarters for the workers were built at Chute Road near Weston.<ref>Mrs. John Horsnell, typescript history "North Mountain Line", Weston binder, [[Kings County Museum|Kings Historical Society]], Kentville</ref>
  
 
Mobilization for war in August 1914 prolonged construction, but intermittent freight service began in September 1914<ref>Letter Alex Ferguson Inspection Engineer, Dept of Railways and Canals, Jan. 14, 1916, Library and Archives Canada RG43-A-1-12, Vol. 227, File 3125</ref> with regular freight service beginning on December 1, 1914 when the line was completed at a cost of $413,000. However the terms of the federal railway subsidy program had required that the line be completed by August 1, 1914, so the CPR had to absorb the complete cost of construction.<ref>[[Marguerite Woodworth]], ''[[History of the Dominion Atlantic Railway]], page 136.</ref>  Passenger service began more slowly and was a officially launched by a large special excursion on August 1 1916 from [[Weston]] to [[Kingsport]] which attracted large crowds including "nearly everyone from Somerset".<ref>Mrs. John Horsnell, typescript history "North Mountain Line", Weston binder, [[Kings County Museum|Kings Historical Society]], Kentville</ref> At completion, the North Mountain Railway Company was absorbed by the DAR and the line became the Weston Subdivision. It was often known collectively, with the [[:Category:Subdivision Kingsport|Kingsport Subdivision]], as the CVR (Cornwallis Valley Railway). The Weston line offered modest passenger service but hosted heavy freight volumes during the fall and winter apple season. Summer traffic included fertilizer and limestone.<ref>''[[The Weston Branch and Margaretville in Nova Scotia]]'' by Elizabeth M. Clarke, page 13</ref>  However the decline of the Annapolis Valley's apple industry and the growth of highways caused a dramatic drop in traffic in the 1950s.
 
Mobilization for war in August 1914 prolonged construction, but intermittent freight service began in September 1914<ref>Letter Alex Ferguson Inspection Engineer, Dept of Railways and Canals, Jan. 14, 1916, Library and Archives Canada RG43-A-1-12, Vol. 227, File 3125</ref> with regular freight service beginning on December 1, 1914 when the line was completed at a cost of $413,000. However the terms of the federal railway subsidy program had required that the line be completed by August 1, 1914, so the CPR had to absorb the complete cost of construction.<ref>[[Marguerite Woodworth]], ''[[History of the Dominion Atlantic Railway]], page 136.</ref>  Passenger service began more slowly and was a officially launched by a large special excursion on August 1 1916 from [[Weston]] to [[Kingsport]] which attracted large crowds including "nearly everyone from Somerset".<ref>Mrs. John Horsnell, typescript history "North Mountain Line", Weston binder, [[Kings County Museum|Kings Historical Society]], Kentville</ref> At completion, the North Mountain Railway Company was absorbed by the DAR and the line became the Weston Subdivision. It was often known collectively, with the [[:Category:Subdivision Kingsport|Kingsport Subdivision]], as the CVR (Cornwallis Valley Railway). The Weston line offered modest passenger service but hosted heavy freight volumes during the fall and winter apple season. Summer traffic included fertilizer and limestone.<ref>''[[The Weston Branch and Margaretville in Nova Scotia]]'' by Elizabeth M. Clarke, page 13</ref>  However the decline of the Annapolis Valley's apple industry and the growth of highways caused a dramatic drop in traffic in the 1950s.

Revision as of 22:27, 14 September 2023


Weston Subdivision "The North Mountain Line" or "the Weston Line" 1914-1961

The Weston Subvision ran 14.5 miles west from Centreville, on the Cornwallis Valley Railway branch, to Weston. Trains originated in Kentville.

History

A typical North Mountain Line station and warehouse at Lakeville with train approaching.

Started in 1910, the Weston Subdivision was completed in 1914. A railway trade magazine article in 1908 mentioned the then-proposed Weston Subdivision. It was often referred to as the North Mountain Railway, the North Mountain Line or the Weston Line but was officially incorporated as the North Mountain Line Railway Company Limited in 1902.[1] The first shareholders were C. Fitch Kemp, Thomas Robert Ronald, Archibald Denny and Robert Lee Campbell, of London, England, and Percy Gifkins, of Kentville, Nova Scotia. All the London residents were on the board of directors of the DAR, (Kemp - President, Ronald - Vice President, Campbell - Secretary, Denny - director) and Percy Gifkins was the General Manager of the DAR. It received a charter to build a railway in 1904 and renewed it in 1906.[2] (According to Marguerite Woodworth's book, page 136, but the legislation allowed construction starting in 1902.) However the owners lacked the money to start construction.

Land acquisition and right of way permissions were sought in 1910 and the Dominion Atlantic Railway announced construction was beginning in April 1910 with an expected completion in 1913.[3][4] In reality, it took the resources of the Canadian Pacific Railway to complete the line after the CPR bought the DAR in 1912. The roadbed was built by Kirk and Cooke, contractors while the stations were built by J. H. Hicks & Sons of Bridgetown.[5] [6] Contractors hired local horse teams as well as Italian labourers. By August 1913, tracks had been laid and construction trains were running as far as Lakeville, while large crews were working on the roadbed as far as Weston.[7] Work included many large concrete culverts and a long pipeline from a spring on the North Mountain to the wye at Weston to supply a locomotive water tank. A cookhouse and quarters for the workers were built at Chute Road near Weston.[8]

Mobilization for war in August 1914 prolonged construction, but intermittent freight service began in September 1914[9] with regular freight service beginning on December 1, 1914 when the line was completed at a cost of $413,000. However the terms of the federal railway subsidy program had required that the line be completed by August 1, 1914, so the CPR had to absorb the complete cost of construction.[10] Passenger service began more slowly and was a officially launched by a large special excursion on August 1 1916 from Weston to Kingsport which attracted large crowds including "nearly everyone from Somerset".[11] At completion, the North Mountain Railway Company was absorbed by the DAR and the line became the Weston Subdivision. It was often known collectively, with the Kingsport Subdivision, as the CVR (Cornwallis Valley Railway). The Weston line offered modest passenger service but hosted heavy freight volumes during the fall and winter apple season. Summer traffic included fertilizer and limestone.[12] However the decline of the Annapolis Valley's apple industry and the growth of highways caused a dramatic drop in traffic in the 1950s.

Map of the North Mountain Railway in 1929

The Weston Line was unique in several ways. Instead of station agents, it employed a travelling agent who rode with each train, selling tickets and settling freight and express as he went. The station wickets were seldom used as most business was done aboard the train, although each station did provide a waiting room with a stove and built-in benches.[13]

Every North Mountain Line station, except Somerset, served as dwellings for the Section Foremen and their families.[14] These stations were all slightly modified versions of the standard CPR Station No. 4 Plan.[15] The Billtown Station, which still survives today, was a typical example. The only other surviving station is Somerset, which was moved to Berwick, heavily modified and converted to a private home.

On January 31, 1961 the entire Weston Subdivision was abandoned as the CVR was reduced to a spur from Kentville to Mill Village.

Trains

Train No. 21 Noon to Kentville

Train No. 22 Morning to Weston

Train No. 23 Evening to Kentville

Train No. 24 Afternoon to Weston

Gallery

References and Footnotes

  1. Ivan Smith, "North Mountain Railway Company Limited", History of Railway Companies in Nova Scotia website
  2. Marguerite Woodworth, History of the Dominion Atlantic Railway, page 136.
  3. Ivan Smith, "North Mountain Railway Company Limited", History of Railway Companies in Nova Scotia website
  4. The Railway and Marine World April 1910, "North Mountain Branch Construction To Begin Soon"
  5. The Weston Branch and Margaretville in Nova Scotia by Elizabeth M. Clarke, page 13 and addendum insert
  6. Letter Alex Ferguson Inspection Engineer, Dept of Railways and Canals, Jan. 14, 1916, Library and Archives Canada RG43-A-1-12, Vol. 227, File 3125
  7. The Weekly Monitor and Western Annapolis Sentinel, August 13 1913 - "DAR's North Mountain Railway - Track Laid To Lakeville"
  8. Mrs. John Horsnell, typescript history "North Mountain Line", Weston binder, Kings Historical Society, Kentville
  9. Letter Alex Ferguson Inspection Engineer, Dept of Railways and Canals, Jan. 14, 1916, Library and Archives Canada RG43-A-1-12, Vol. 227, File 3125
  10. Marguerite Woodworth, History of the Dominion Atlantic Railway, page 136.
  11. Mrs. John Horsnell, typescript history "North Mountain Line", Weston binder, Kings Historical Society, Kentville
  12. The Weston Branch and Margaretville in Nova Scotia by Elizabeth M. Clarke, page 13
  13. Mrs. John Horsnell, typescript history "North Mountain Line", Weston binder, Kings Historical Society, Kentville
  14. The Weston Branch and Margaretville in Nova Scotia by Elizabeth M. Clarke, page 13 and addendum insert
  15. Station No. 4: General Arrangement at Canadian Pacific Historical Association and Station No. 4: Cross Section & details at Canadian Pacific Historical Association

External Links

Locations

Locations categorised under "W" are on the Centreville to Weston leg (west). <math>Insert formula here</math>

Pages in category "Subdivision Weston"

The following 8 pages are in this category, out of 8 total.